Skip to main content

Plan Placement and Mark Handrail Height — Install Handrails and Guardrails

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 10 of 10

Helpful?

In this video

Begin by deciding which side of the staircase the handrail will be installed on. Using a level and a pencil, mark the desired height for the handrail on the wall. Building code requirements typically mandate a handrail height between a 34-inch minimum and a 38-inch maximum, measured from the tread nosing to the top of the rail. For this project, a height of 36 inches is chosen as it falls within the acceptable range. When marking, account for the height of the mounting brackets and the thickness of the handrail itself to ensure the top surface of the finished rail is at the intended height.

41.0K views130
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

for this stair rail we have decided that putting it on the right side of the wall would it be best measure out the height of your rail in our case code requirements are at 34 inch minimum and a 38 inch maximum height from the tread nosing to the top of the rail so we'll do it in between at 36 inches keep in account the height of the bracket and the thickness of the rail

Auto-generated transcript. May contain errors.