Skip to main content

Measure Total Rise — Determine Total Rise

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 1 of 10

Helpful?

In this video

Begin by accurately measuring the total vertical rise that the staircase needs to cover. This measurement should be taken from the top of the finished lower floor to the top of the finished upper floor. If the finished flooring on the upper level is not yet installed, measure to the top of the subfloor and add the anticipated thickness of the finished flooring (e.g., 2 inches as mentioned in the video for future boards). This overall height is crucial for calculating consistent step dimensions.

8.6K views496
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

stairs the first step is to measure from a finished surface to a finished surface so if you didn't have that flooring up there yet you would just measure from the finished surface to what the finished surface will be in the future those boards are 2 in thick so you would add 2 in to the joist hangers finish surface to finish surface in this case it's 85.5 in

Auto-generated transcript. May contain errors.