Skip to main content

Calculate Unit Run and Total Run — Determine Total Run

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 3 of 10

Helpful?

In this video

Now, determine the 'unit run' (the depth of each step) and the 'total run' (the overall horizontal distance the stairs will cover). A golden rule for comfortable stairs is that the sum of the unit rise and unit run should be between 17 to 18 inches. Given a unit rise of 7.25 inches, a unit run of approximately 10 to 10.5 inches would be suitable (e.g., 10.25 inches). To find the total run, count the number of rises determined in the previous step (e.g., 8 rises). The number of treads (or unit runs) will typically be one less than the number of rises. So, for 8 rises, there will be 7 runs. Multiply the unit run by the number of runs to get the total run. For example, 10.25 inches (unit run) * 7 (runs) = 71.75 inches total run.

53.3K views749
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

Okay, so now that we found out our total rise, now we can find out our total run. So, the total run is a lot easier unless you're constrained or you're you're limited by how far out you can go, you can really just want to make the stairs comfortable. So, the golden rule that I was taught was you want your unit rise and unit run, when you add them together, to land in between 17 to 18 in. And that'll make for a comfortable step. So, if we have a unit rise of 7.25, that means, you know, we're going to want about a 10 to 10 and 1/2 in run. So, let's just say we have a 10. 25 unit run. And this will be unit rise. So, now all we have to do, and it's really easy now that it's drawn out here, is we just have to calculate how many treads or how many unit runs are going to be in the stringer. So, if we just count it, you know, we have our 1 2 3 4 5 6 7 8 rises that we figured out before. Now, we just count 1 2 3 4 5 6 7. So, it's very common that you'll have one less tread than your riser, but okay, so the last thing we need to

Auto-generated transcript. May contain errors.