Skip to main content

Install and Level the Stairs — Attach Stringers to Floor and Landing

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 8 of 10

Helpful?

In this video

With the stairs fully assembled, it's the moment of truth: carefully move and position the staircase into its designated permanent spot. Before making any final attachments, use a level to meticulously check the final levels and ensure the stairs are properly aligned and stable. Once you are completely satisfied with the positioning, level, and stability, securely fix the stringers to the existing structure (e.g., a deck, landing, or foundation) using appropriate fasteners. This will complete the installation, providing a sturdy and functional set of stairs.

910.5K views2.5K
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

and then tighten it off with a washer and bolt. This will stop your stairs from warping or buckling. Okay it's the moment of truth, it's time to position these stairs. Now don't forget to check your final levels before you fix them off at the stringers and there you go a set of stairs. Now they might not go all the way to heaven but the fact you did them yourself means they're pretty close you

Auto-generated transcript. May contain errors.