Determine the Total Rise — Determine Total Rise
Part of project
How to Measure Alternating Tread Stairs · Step 1 of 10
In this video
Measure the total vertical distance from the *finished* lower floor to the *finished* upper floor. If the subfloor is exposed on the upper level, place a sample piece of your finished flooring on top of the subfloor before taking the measurement. Similarly, if the lower floor is not finished (e.g., dirt), place a sample of the intended finished flooring (e.g., patio blocks) before measuring. For this project, the finished concrete floor on the bottom and a finished pine floor on top result in a total rise of 36.5 inches (927 millimeters). Additionally, check if the floor is level further away from the stairwell header by extending a level beyond the header and measuring down; use the measurement from where the stringer will actually sit if there's a difference.
75K subscribers
FAQs
What are the key safety considerations and local code requirements for alternating tread stairs?
Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.
How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?
While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.
What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?
The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.
Are there any essential tools for measuring alternating tread stairs beyond a tape measure?
Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.
TranscriptHide
Auto-generated transcript. May contain errors.
Determine the Total Rise — Determine Total Rise
Part of project
How to Measure Alternating Tread Stairs · Step 1 of 10
In this video
Measure the total vertical distance from the *finished* lower floor to the *finished* upper floor. If the subfloor is exposed on the upper level, place a sample piece of your finished flooring on top of the subfloor before taking the measurement. Similarly, if the lower floor is not finished (e.g., dirt), place a sample of the intended finished flooring (e.g., patio blocks) before measuring. For this project, the finished concrete floor on the bottom and a finished pine floor on top result in a total rise of 36.5 inches (927 millimeters). Additionally, check if the floor is level further away from the stairwell header by extending a level beyond the header and measuring down; use the measurement from where the stringer will actually sit if there's a difference.
Frequently Asked Questions
What are the key safety considerations and local code requirements for alternating tread stairs?
Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.
How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?
While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.
What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?
The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.
Are there any essential tools for measuring alternating tread stairs beyond a tape measure?
Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.
Video Transcript
(2,187 characters)Hide
Video Transcript
(2,187 characters)Transcript may be auto-generated and contain errors.