Determine the Total Rise — Determine Total Rise

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 1 of 10

Helpful?

In this video

Measure the total vertical distance from the *finished* lower floor to the *finished* upper floor. If the subfloor is exposed on the upper level, place a sample piece of your finished flooring on top of the subfloor before taking the measurement. Similarly, if the lower floor is not finished (e.g., dirt), place a sample of the intended finished flooring (e.g., patio blocks) before measuring. For this project, the finished concrete floor on the bottom and a finished pine floor on top result in a total rise of 36.5 inches (927 millimeters). Additionally, check if the floor is level further away from the stairwell header by extending a level beyond the header and measuring down; use the measurement from where the stringer will actually sit if there's a difference.

3.6M views41.5K
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

to stair building okay with that out of the way  let me show you how i solved for our unit rise the   first step to determine unit rise is to determine  the total rise again the total rise is the total   vertical distance from one finished floor to  another finished floor for example here this   plywood represents the subfloor on the inside of a  house which is not the finished floor therefore we   need to take a piece of sample finish floor and  hold it into its position before measuring the   total rise the other thing to think through before  getting your total rise is the floor below for our   example the concrete floor here is the finished  floor but let's say that it wasn't your finished   floor you would have to do the same thing as we  did up top which is to take a piece of sample   finished flooring and lay it down to measure off  of but since our concrete floor is the finished   floor the total rise from the top of the finished  concrete to the top of the finished pine floor   measures 36.5 inches or 927 mil and before we move  on i forgot to mention something pretty important   and that is you need to check how level the floor  is further out away from the header to check this   extend the level beyond the header and measure  down to see if the total rise is the same in that   area as it is in the area underneath the header  if the measurement further away from the header is   different you either must make them the same which  can be very difficult or go with the measurement   that's out further where the actual stringer will  be setting so for our example here the measurement   is quite the same so i'm going to go ahead and go  with the measurement that's right under the header   with the total rise now identified  let's go ahead and move on to step two   which is the math behind solving for unit rise the  ideal rise for a stair is seven inches or 177 mil  