Skip to main content

Measure and Calculate Total Rise — Determine Total Rise

Beginner2 hours

Part of project

How to Measure Alternating Tread Stairs · Step 1 of 10

Helpful?

In this video

The first step in calculating stairs is to determine the total rise, which is the vertical distance from finished floor to finished floor. The presenter measures from the top of the main floor's subfloor (rim) to the upstairs subfloor. He gets 118 and 5/8 inches. Since the finished floor on both levels will be 3/4 inch thick (hardwood downstairs, carpet and pad upstairs), he adds 3/4 inch to his measurement using a construction calculator (BuildCalc). The final total rise is 119 and 3/8 inches. This ensures that all individual risers will be equal in height after the finished floor is installed.

17.0K views813
stairbuilding

75K subscribers

View Channel

FAQs

What are the key safety considerations and local code requirements for alternating tread stairs?

Alternating tread stairs are often subject to strict local building codes due to their unique design and steeper pitch. You must verify specific requirements for rise, run, tread depth, and handrail placement in your area, as they are typically restricted to secondary access. Always consult with your local building department or a licensed professional to ensure compliance and safety.

How difficult is it to build alternating tread stairs for a beginner, and what's the estimated time?

While measuring is a beginner-level task, the overall construction of alternating tread stairs can be challenging due to the precision required for measurements and adherence to strict building codes. The '2 hours' estimated is for the measuring and planning phase. Actual construction will take significantly longer, and professional guidance is often recommended to ensure structural integrity and code compliance.

What are the most common measurement mistakes when planning alternating tread stairs, and how can I avoid them?

The most common mistakes include incorrect total rise/run calculations or errors in determining individual tread depths for the alternating pattern. To avoid these, double-check all measurements meticulously with a level and a construction master calculator. Ensure your stringer layout precisely matches your calculated rise and run to prevent uneven and unsafe steps.

Are there any essential tools for measuring alternating tread stairs beyond a tape measure?

Yes, beyond a reliable measuring tape, a long level is critical for establishing true horizontal and vertical lines. A Construction Master calculator (like the Calculated Industries Construction Master 5) is highly recommended for accurate calculations of rise, run, and tread spacing. A Speed Square is also vital for marking precise cuts on stringers.

Transcript
Hide

quality. All right, so the first thing I need to know for stairs is my total rise. And ideally, that is finished floor to finished floor. In my case, I have hardwood on the main floor, which is 3/4. Upstairs, I have carpet and pad, which is 3/4. So, this is really easy. I don't have to account for that or there's no there's no difference. So, I just need my floor to floor measurement. So, I have from the top of my rim to my subfloor 118 and 5/8, but I know I'm going to have 3/4 in subfloor up above. So, I need to add that. So, 118 and 5/8 plus 3/4 119 and 3/8. That is the rise that I will divide out to get equal stairs all the way up. 119 and 3/8. I know a guy that forgets these things. 119 and 3/8. 119 and 38. 119 and 38. There's a nail. Okay, let's take a look at the plans because I need to know how many rises do I have total on the second floor plan.

Auto-generated transcript. May contain errors.