Skip to main content
Oak Valley DesignsOak Valley Designs
BrowseMy Projects
Log inSign up
Oak Valley Designs
Project video

Step 7 · Connect Water Supply Lines to Faucet

Attach one end of the braided stainless steel supply line to the outlet of the hot water shut-off valve and the other end to the hot water inlet on the faucet. Repeat this process for the cold water supply. Hand-tighten the connections first, then use an adjustable wrench to snug them up. Avoid overtightening.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Connect Water Supply Lines to Faucet

Attach one end of the braided stainless steel supply line to the outlet of the hot water shut-off valve and the other end to the hot water inlet on the faucet. Repeat this process for the cold water supply. Hand-tighten the connections first, then use an adjustable wrench to snug them up. Avoid overtightening.

← Project

Bathroom Vanity Installation

Step 7 of 9·1.1 hr left

Mark Vanity Position and Cutouts
30 minutes
Prepare Water Supply Lines
45 minutes
Connect New Faucet to Sink
25 minutes
Install Drain Assembly
30 minutes
Mount the Vanity Cabinet
30 minutes
Install Countertop and Sink
40 minutes
7
Connect Water Supply Lines to Faucet
20 minutes
8
Connect Drain Plumbing
25 minutes
9
Test Plumbing and Seal Gaps
20 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.