Skip to main content
Oak Valley DesignsOak Valley Designs
BrowseMy Projects
Log inSign up
Oak Valley Designs
Project video

Step 1 · Mark Vanity Position and Cutouts

Before attaching the vanity, place it in its final position. Use a level to ensure it is straight. Measure and mark the wall for the vanity's footprint. Identify the exact locations where the hot and cold water supply lines and the drain pipe will pass through the vanity or the wall behind it. Mark these locations for subsequent drilling or cutting.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Mark Vanity Position and Cutouts

Before attaching the vanity, place it in its final position. Use a level to ensure it is straight. Measure and mark the wall for the vanity's footprint. Identify the exact locations where the hot and cold water supply lines and the drain pipe will pass through the vanity or the wall behind it. Mark these locations for subsequent drilling or cutting.

← Project

Bathroom Vanity Installation

Step 1 of 9·4.4 hr left

1
Mark Vanity Position and Cutouts
30 minutes
2
Prepare Water Supply Lines
45 minutes
3
Connect New Faucet to Sink
25 minutes
4
Install Drain Assembly
30 minutes
5
Mount the Vanity Cabinet
30 minutes
6
Install Countertop and Sink
40 minutes
7
Connect Water Supply Lines to Faucet
20 minutes
8
Connect Drain Plumbing
25 minutes
9
Test Plumbing and Seal Gaps
20 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.