Skip to main content
Oak Valley DesignsOak Valley Designs
BrowseMy Projects
Log inSign up
Oak Valley Designs
Project video

Step 5 · Mount the Vanity Cabinet

Position the vanity cabinet in its final location, ensuring it is flush against the wall. Use a level to confirm it is perfectly horizontal. Locate the studs marked earlier. Drill pilot holes through the back of the vanity cabinet and into the center of the wall studs. Drive appropriate screws through the vanity's mounting points (usually the top horizontal support) into the studs to firmly secure the cabinet.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Mount the Vanity Cabinet

Position the vanity cabinet in its final location, ensuring it is flush against the wall. Use a level to confirm it is perfectly horizontal. Locate the studs marked earlier. Drill pilot holes through the back of the vanity cabinet and into the center of the wall studs. Drive appropriate screws through the vanity's mounting points (usually the top horizontal support) into the studs to firmly secure the cabinet.

← Project

Bathroom Vanity Installation

Step 5 of 9·2.3 hr left

Mark Vanity Position and Cutouts
30 minutes
Prepare Water Supply Lines
45 minutes
Connect New Faucet to Sink
25 minutes
Install Drain Assembly
30 minutes
5
Mount the Vanity Cabinet
30 minutes
6
Install Countertop and Sink
40 minutes
7
Connect Water Supply Lines to Faucet
20 minutes
8
Connect Drain Plumbing
25 minutes
9
Test Plumbing and Seal Gaps
20 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.