Step 2 · Prepare Water Supply Lines

Turn off the main water supply to the house. Remove the old shut-off valves. Clean the ends of the pipes where the new valves will be installed. Install new quarter-turn shut-off valves for both the hot and cold water lines, ensuring a watertight seal using appropriate fittings and sealant if necessary. Turn the main water supply back on and check for leaks at the new valves.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare Water Supply Lines

Turn off the main water supply to the house. Remove the old shut-off valves. Clean the ends of the pipes where the new valves will be installed. Install new quarter-turn shut-off valves for both the hot and cold water lines, ensuring a watertight seal using appropriate fittings and sealant if necessary. Turn the main water supply back on and check for leaks at the new valves.

← Project

Bathroom Vanity Installation

Step 2 of 9·3.9 hr left

Mark Vanity Position and Cutouts
30 minutes
2
Prepare Water Supply Lines
45 minutes
3
Connect New Faucet to Sink
25 minutes
4
Install Drain Assembly
30 minutes
5
Mount the Vanity Cabinet
30 minutes
6
Install Countertop and Sink
40 minutes
7
Connect Water Supply Lines to Faucet
20 minutes
8
Connect Drain Plumbing
25 minutes
9
Test Plumbing and Seal Gaps
20 minutes