Step 2 · Prepare Water Supply Lines
Turn off the main water supply to the house. Remove the old shut-off valves. Clean the ends of the pipes where the new valves will be installed. Install new quarter-turn shut-off valves for both the hot and cold water lines, ensuring a watertight seal using appropriate fittings and sealant if necessary. Turn the main water supply back on and check for leaks at the new valves.
