Steps
Mark Vanity Position and Cutouts
30 minutesBefore attaching the vanity, place it in its final position. Use a level to ensure it is straight. Measure and mark the wall for the vanity's footprint. Identify the exact locations where the hot and cold water supply lines and the drain pipe will pass through the vanity or the wall behind it. Mark these locations for subsequent drilling or cutting.
Prepare Water Supply Lines
45 minutesTurn off the main water supply to the house. Remove the old shut-off valves. Clean the ends of the pipes where the new valves will be installed. Install new quarter-turn shut-off valves for both the hot and cold water lines, ensuring a watertight seal using appropriate fittings and sealant if necessary. Turn the main water supply back on and check for leaks at the new valves.
Connect New Faucet to Sink
25 minutesPlace the sink upside down on a protected surface. Insert the faucet base plate and faucet body through the pre-drilled holes in the sink. Secure the faucet from underneath using the provided mounting hardware, washers, and nuts. Ensure the faucet is centered and tightened securely, but do not overtighten to avoid damaging the sink or faucet.
Install Drain Assembly
30 minutesInsert the drain flange into the sink drain opening. From underneath the sink, attach the rubber gasket, friction washer, and mounting nut. Tighten the mounting nut securely. Attach the tailpiece to the bottom of the drain assembly. If needed, connect a drain extension kit or tailpiece extension to align with the vanity's drainpipe.
Mount the Vanity Cabinet
30 minutesPosition the vanity cabinet in its final location, ensuring it is flush against the wall. Use a level to confirm it is perfectly horizontal. Locate the studs marked earlier. Drill pilot holes through the back of the vanity cabinet and into the center of the wall studs. Drive appropriate screws through the vanity's mounting points (usually the top horizontal support) into the studs to firmly secure the cabinet.
Install Countertop and Sink
40 minutesCarefully set the countertop onto the vanity cabinet, aligning it with the edges. If the sink is an undermount type, apply a bead of silicone sealant around the edge of the sink rim and carefully press it into place against the underside of the countertop, securing with clips. If it's a drop-in sink, apply sealant around the edge of the sink opening on the countertop, then place the sink into the opening and secure from underneath with mounting clips. Wipe away any excess sealant.
Connect Water Supply Lines to Faucet
20 minutesAttach one end of the braided stainless steel supply line to the outlet of the hot water shut-off valve and the other end to the hot water inlet on the faucet. Repeat this process for the cold water supply. Hand-tighten the connections first, then use an adjustable wrench to snug them up. Avoid overtightening.
Connect Drain Plumbing
25 minutesAssemble the P-trap. Connect the tailpiece extending from the sink's drain assembly to the inlet side of the P-trap. Connect the outlet side of the P-trap to the drainpipe coming from the wall. Ensure all connections are hand-tightened first, then snugged with a wrench. Use Teflon tape or pipe dope on threaded connections if recommended.
Test Plumbing and Seal Gaps
20 minutesSlowly turn the main water supply back on. Open the shut-off valves. Turn on the faucet to check for leaks at the supply line connections, faucet base, and drain assembly. Check the drain for leaks by filling the sink and letting it drain. Once all plumbing is confirmed leak-free, apply a bead of silicone sealant along the seam where the top of the vanity meets the wall for a finished look and to prevent water intrusion.