Skip to main content

Install Retro Treads — Dry Fit Treads

Intermediate4 mins

Part of project

Stair Tread Installation · Step 3 of 7

Helpful?

In this video

Before permanent installation, each cut pre-finished retro tread is dry-fitted to ensure a snug and accurate fit against the installed riser and skirt boards. Once the fit is confirmed, the tread is removed, and a generous serpentine bead of PL Premium construction adhesive is applied to its underside. The tread is then carefully placed back into its position, ensuring perfect alignment. A rubber mallet is used to gently tap the tread into place, promoting good contact with the adhesive and securing a tight fit. Finally, the corners of the tread are reinforced and secured with 2-inch finish nails using a Porter Cable finish nail gun. This installation process is repeated for all remaining treads until the entire staircase is completed.

3.4M views15.7K
This Old House

2.3M subscribers

View Channel

FAQs

How challenging is installing solid stair treads, and what's a realistic estimate for time and material costs?

This project is considered intermediate due to the need for precise measurements, cuts, and careful fitting. Expect to dedicate about 4 days, including adhesive curing and finishing time. Material costs vary widely based on wood type and finish, but budget for treads, adhesive, fasteners, and finishing supplies.

What are the most important safety precautions I should follow when working on stairs?

Always use appropriate personal protective equipment, including eye and ear protection when cutting, and gloves for adhesives/finishes. Ensure the work area is well-lit and stable, and be mindful of fall hazards, especially when stairs are partially disassembled. Good ventilation is crucial when applying adhesives or sealants.

What common mistakes should I avoid when measuring and cutting my new stair treads?

A frequent mistake is not accounting for the nosing overhang or slightly inconsistent measurements, which leads to gaps or unevenness. Always dry fit each tread before final installation, and consider making a template for repetitive cuts to ensure accuracy. Double-check all measurements before making any cuts to prevent waste.

How can I ensure the new stair treads are securely installed and don't creak later?

Use a high-quality construction adhesive specifically designed for wood and ensure full contact with the riser structure. For extra security and to prevent future creaks, consider using screws from the underside or side stringers where possible. Allow adequate adhesive cure time before placing heavy loads on the stairs.

Transcript
Hide

tread check your cuts by dry fitting in place if everything is a tight fit apply a bead of pl premium to the underside of your new pre-finished retro tread tap the tread in place using a rubber mallet and secure the corners using two inch finish nails

Auto-generated transcript. May contain errors.