Skip to main content

Install Risers — Prepare Riser Structure

Intermediate4 mins

Part of project

Stair Tread Installation · Step 1 of 7

Helpful?

In this video

Start by installing the new risers. Use a pencil to mark the height of the riser on the inner stringer. If the height of the riser is consistent, multiple pieces can be cut in advance using a table saw set at the appropriate angle (e.g., 5 degrees as shown in the video). Apply a strong construction adhesive, such as PL Premium, to the back of the riser before placing it firmly against the existing stair structure.

251.5K views1.3K
This Old House

2.3M subscribers

View Channel

FAQs

How challenging is installing solid stair treads, and what's a realistic estimate for time and material costs?

This project is considered intermediate due to the need for precise measurements, cuts, and careful fitting. Expect to dedicate about 4 days, including adhesive curing and finishing time. Material costs vary widely based on wood type and finish, but budget for treads, adhesive, fasteners, and finishing supplies.

What are the most important safety precautions I should follow when working on stairs?

Always use appropriate personal protective equipment, including eye and ear protection when cutting, and gloves for adhesives/finishes. Ensure the work area is well-lit and stable, and be mindful of fall hazards, especially when stairs are partially disassembled. Good ventilation is crucial when applying adhesives or sealants.

What common mistakes should I avoid when measuring and cutting my new stair treads?

A frequent mistake is not accounting for the nosing overhang or slightly inconsistent measurements, which leads to gaps or unevenness. Always dry fit each tread before final installation, and consider making a template for repetitive cuts to ensure accuracy. Double-check all measurements before making any cuts to prevent waste.

How can I ensure the new stair treads are securely installed and don't creak later?

Use a high-quality construction adhesive specifically designed for wood and ensure full contact with the riser structure. For extra security and to prevent future creaks, consider using screws from the underside or side stringers where possible. Allow adequate adhesive cure time before placing heavy loads on the stairs.

Transcript
Hide

And here we already installed some um stair threads and risers. Usually I use a pencil at the inner stringer and mark the top with an arrow. And if you know the height of the riser, you can already cut off um couple pieces on the table. So, usually I cut like six, seven at the same time. You can set your table so in an angle to cut uh the previous uh marked line. Mark the other side with the pencil. Be accurate. And connect this lines lines with the pencil and cut it off. for the riser and the stair threads. Usually I use always PL premium.

Auto-generated transcript. May contain errors.