Skip to main content

Assess Stair Structure and Plan Riser Installation — Prepare Riser Structure

Intermediate4 mins

Part of project

Stair Tread Installation · Step 1 of 7

Helpful?

In this video

Analyze the existing stair structure. The primary issue is that the old treads (the horizontal part) hung over the risers (the vertical part), creating a gap. The underlying wood is often 'crummy' and unsuitable for direct finishing. The solution proposed is to install new, primed 1x8 pine boards as risers to cover the gap and provide a clean, flush surface for the new treads. Small blocks are shown being used as temporary spacers or permanent supports behind the risers to prevent them from pushing back.

1.3M views2.4K
This Old House

2.3M subscribers

View Channel

FAQs

How challenging is installing solid stair treads, and what's a realistic estimate for time and material costs?

This project is considered intermediate due to the need for precise measurements, cuts, and careful fitting. Expect to dedicate about 4 days, including adhesive curing and finishing time. Material costs vary widely based on wood type and finish, but budget for treads, adhesive, fasteners, and finishing supplies.

What are the most important safety precautions I should follow when working on stairs?

Always use appropriate personal protective equipment, including eye and ear protection when cutting, and gloves for adhesives/finishes. Ensure the work area is well-lit and stable, and be mindful of fall hazards, especially when stairs are partially disassembled. Good ventilation is crucial when applying adhesives or sealants.

What common mistakes should I avoid when measuring and cutting my new stair treads?

A frequent mistake is not accounting for the nosing overhang or slightly inconsistent measurements, which leads to gaps or unevenness. Always dry fit each tread before final installation, and consider making a template for repetitive cuts to ensure accuracy. Double-check all measurements before making any cuts to prevent waste.

How can I ensure the new stair treads are securely installed and don't creak later?

Use a high-quality construction adhesive specifically designed for wood and ensure full contact with the riser structure. For extra security and to prevent future creaks, consider using screws from the underside or side stringers where possible. Allow adequate adhesive cure time before placing heavy loads on the stairs.

Transcript
Hide

but we've run into now is the tread which is the vertical the horizontal part you actually step on hangs over the risers risers are the horse the vertical ones horizontal vertical step hold it up so we've got this gap in here this lip we could fill this up and try to clean this up but this is crummy wood so you don't want to do that so we decided to do is we got these planks of pine it's already primed it's just a one by eight it fits exactly perfect for our stairs your stairs may be different but i think it's probably standard so it might be about the same and that can fits perfectly cut it to there

Auto-generated transcript. May contain errors.