Skip to main content

Allow for Curing and Final Cleanup — Allow Adhesive to Cure

Intermediate4 mins

Part of project

Stair Tread Installation · Step 6 of 7

Helpful?

In this video

Allow the construction adhesive to cure completely. The video mentions a cure time of 2 to 7 days, so avoid stepping on the newly repaired steps during this period to allow the adhesive to fully bond and strengthen. The man places a traffic cone as a visual reminder to prevent anyone from walking on the step prematurely. After the curing time, blow away any residual dirt or debris from the area.

18.3K views203
This Old House

2.3M subscribers

View Channel

FAQs

How challenging is installing solid stair treads, and what's a realistic estimate for time and material costs?

This project is considered intermediate due to the need for precise measurements, cuts, and careful fitting. Expect to dedicate about 4 days, including adhesive curing and finishing time. Material costs vary widely based on wood type and finish, but budget for treads, adhesive, fasteners, and finishing supplies.

What are the most important safety precautions I should follow when working on stairs?

Always use appropriate personal protective equipment, including eye and ear protection when cutting, and gloves for adhesives/finishes. Ensure the work area is well-lit and stable, and be mindful of fall hazards, especially when stairs are partially disassembled. Good ventilation is crucial when applying adhesives or sealants.

What common mistakes should I avoid when measuring and cutting my new stair treads?

A frequent mistake is not accounting for the nosing overhang or slightly inconsistent measurements, which leads to gaps or unevenness. Always dry fit each tread before final installation, and consider making a template for repetitive cuts to ensure accuracy. Double-check all measurements before making any cuts to prevent waste.

How can I ensure the new stair treads are securely installed and don't creak later?

Use a high-quality construction adhesive specifically designed for wood and ensure full contact with the riser structure. For extra security and to prevent future creaks, consider using screws from the underside or side stringers where possible. Allow adequate adhesive cure time before placing heavy loads on the stairs.

Transcript
Hide

as well all right so one of the main things is you get a lot of dirt in there as you see I pulled all that out so I'm going to take my blue flower and just blow all that out once I'm done but as you see it's coming down I got a lot in there so hopefully it does not come loose again so I was probably a little too uh generous with this one but um like I said we are not going to step on this um and we're going to clean that up okay so for the Cure time it says about two to seven days so I'm gonna give this two days we're gonna come back and I'm gonna show you guys how well this actually all right guys so here we are

Auto-generated transcript. May contain errors.