Skip to main content

Install New Treads and Secure with Shims/Glue/Nails — Dry Fit Treads

Intermediate4 mins

Part of project

Stair Tread Installation · Step 3 of 7

Helpful?

In this video

Before permanent installation, dry-fit each new tread and riser combination. Check everywhere for a good, tight fit and minimal gaps. While tiny gaps can be filled later, strive for as few as possible to avoid relying on excessive filler. To ensure a gap-free fit at the bottom of the tread against the previous riser, place cardboard shims at the top of the newly installed riser. Apply a generous amount of strong construction adhesive (like PL Premium) to the underside of the new tread, then press it firmly down onto the existing tread and against the riser. Use a nail gun to secure the tread in place by firing nails into the tread and riser.

251.5K views1.3K
This Old House

2.3M subscribers

View Channel

FAQs

How challenging is installing solid stair treads, and what's a realistic estimate for time and material costs?

This project is considered intermediate due to the need for precise measurements, cuts, and careful fitting. Expect to dedicate about 4 days, including adhesive curing and finishing time. Material costs vary widely based on wood type and finish, but budget for treads, adhesive, fasteners, and finishing supplies.

What are the most important safety precautions I should follow when working on stairs?

Always use appropriate personal protective equipment, including eye and ear protection when cutting, and gloves for adhesives/finishes. Ensure the work area is well-lit and stable, and be mindful of fall hazards, especially when stairs are partially disassembled. Good ventilation is crucial when applying adhesives or sealants.

What common mistakes should I avoid when measuring and cutting my new stair treads?

A frequent mistake is not accounting for the nosing overhang or slightly inconsistent measurements, which leads to gaps or unevenness. Always dry fit each tread before final installation, and consider making a template for repetitive cuts to ensure accuracy. Double-check all measurements before making any cuts to prevent waste.

How can I ensure the new stair treads are securely installed and don't creak later?

Use a high-quality construction adhesive specifically designed for wood and ensure full contact with the riser structure. For extra security and to prevent future creaks, consider using screws from the underside or side stringers where possible. Allow adequate adhesive cure time before placing heavy loads on the stairs.

Transcript
Hide

Make sure you check everywhere is good. Everywhere is nice. Make sure there is no gap. Tiny gaps you can fill, but you don't want to see too many fillers on your staircase. So, make sure you do those all those steps You can also use some cardboard shims at the top of your uh riser. And this way actually there is some uh force by the time you try to hit it to the to the previous riser to make sure the bottom part is going to be gap free. You already me measured this, but make sure you can compress that cardboard. And if you uh apply some extra glue at the end, it's going to be a piece of cake and your stair is going to be gap free.

Auto-generated transcript. May contain errors.