Determine the Total Rise — Measure the Total Rise
Part of project
How to Measure and Plan Treads for a Split-Level Staircase · Step 1 of 8
In this video
Measure the total vertical distance from the *finished* lower floor to the *finished* upper floor. If the subfloor is exposed on the upper level, place a sample piece of your finished flooring on top of the subfloor before taking the measurement. Similarly, if the lower floor is not finished (e.g., dirt), place a sample of the intended finished flooring (e.g., patio blocks) before measuring. For this project, the finished concrete floor on the bottom and a finished pine floor on top result in a total rise of 36.5 inches (927 millimeters). Additionally, check if the floor is level further away from the stairwell header by extending a level beyond the header and measuring down; use the measurement from where the stringer will actually sit if there's a difference.
75K subscribers
FAQs
Are all the tools listed necessary for just measuring and planning the staircase treads, or are some for later construction?
For the measuring and planning phase, the essential tools are a 25 ft. tape measure, level, pencil, and a construction calculator (like the Construction Master 5). Items such as the architect ruler can assist in sketching, but materials like tile or vent pipe flashing are intended for the actual construction and finishing phases of the staircase.
How important is verifying local building codes for staircase dimensions, and what happens if I don't?
Verifying local building codes is absolutely critical for safety, comfort, and legality. Codes dictate minimum and maximum riser heights, tread depths, and other dimensions to prevent trip hazards and ensure a safe ascent/descent. Ignoring them can lead to unsafe stairs, failed inspections, and potential liability issues if someone is injured.
What is the most common mistake beginners make when measuring for staircase treads, and how can I avoid it?
A common mistake is an inaccurate initial 'total rise' measurement. Even small errors here will compound over multiple steps, leading to uneven or non-compliant individual riser heights. To avoid this, use a level to ensure your measurement from the finished floor below to the finished floor above is precise, and double-check your numbers multiple times.
Does planning treads for a split-level staircase require any special considerations compared to a straight staircase?
Yes, a split-level staircase often involves multiple flights, landings, or turns, which can complicate the 'total run' measurement and overall layout. You must accurately measure and plan each individual flight and any intermediate landings separately, ensuring that each section adheres to building code requirements for rise, run, and headroom.
TranscriptHide
Auto-generated transcript. May contain errors.
Determine the Total Rise — Measure the Total Rise
Part of project
How to Measure and Plan Treads for a Split-Level Staircase · Step 1 of 8
In this video
Measure the total vertical distance from the *finished* lower floor to the *finished* upper floor. If the subfloor is exposed on the upper level, place a sample piece of your finished flooring on top of the subfloor before taking the measurement. Similarly, if the lower floor is not finished (e.g., dirt), place a sample of the intended finished flooring (e.g., patio blocks) before measuring. For this project, the finished concrete floor on the bottom and a finished pine floor on top result in a total rise of 36.5 inches (927 millimeters). Additionally, check if the floor is level further away from the stairwell header by extending a level beyond the header and measuring down; use the measurement from where the stringer will actually sit if there's a difference.
Frequently Asked Questions
Are all the tools listed necessary for just measuring and planning the staircase treads, or are some for later construction?
For the measuring and planning phase, the essential tools are a 25 ft. tape measure, level, pencil, and a construction calculator (like the Construction Master 5). Items such as the architect ruler can assist in sketching, but materials like tile or vent pipe flashing are intended for the actual construction and finishing phases of the staircase.
How important is verifying local building codes for staircase dimensions, and what happens if I don't?
Verifying local building codes is absolutely critical for safety, comfort, and legality. Codes dictate minimum and maximum riser heights, tread depths, and other dimensions to prevent trip hazards and ensure a safe ascent/descent. Ignoring them can lead to unsafe stairs, failed inspections, and potential liability issues if someone is injured.
What is the most common mistake beginners make when measuring for staircase treads, and how can I avoid it?
A common mistake is an inaccurate initial 'total rise' measurement. Even small errors here will compound over multiple steps, leading to uneven or non-compliant individual riser heights. To avoid this, use a level to ensure your measurement from the finished floor below to the finished floor above is precise, and double-check your numbers multiple times.
Does planning treads for a split-level staircase require any special considerations compared to a straight staircase?
Yes, a split-level staircase often involves multiple flights, landings, or turns, which can complicate the 'total run' measurement and overall layout. You must accurately measure and plan each individual flight and any intermediate landings separately, ensuring that each section adheres to building code requirements for rise, run, and headroom.
Video Transcript
(2,187 characters)Hide
Video Transcript
(2,187 characters)Transcript may be auto-generated and contain errors.