Fill Steps with Gravel — Fill Frames with Gravel

Beginner3 mins

Part of project

How to Build Timber and Gravel Steps on a Slope · Step 6 of 8

Helpful?

In this video

Once the stair boxes are securely in place, fill each bay with gravel. If you have rocks on your property, it's recommended to use some of them to fill the front portion of each bay first; this will save on the amount of gravel you need to buy. The steps must be filled with gravel, not sand or dirt, because gravel allows for proper drainage and prevents weed growth, which extends the life of the wooden stairs. Gravel should ideally be purchased in bulk to save costs. This final phase of carrying gravel up the hill to fill each step is labor-intensive, so pace yourself and consider it an "exercise phase." For very long runs of stairs, such as a 100-step version, consider using the absolute longest 2x6 lumber available (typically 16 feet, but possibly longer locally) to minimize joints. If the angle of the hillside is too steep or there are obstacles that need to be avoided, you may need to decrease the angle and create switchbacks, which will require additional digging.

1.1M views49.0K
Mr. Build It

1.0M subscribers

View Channel

FAQs

Is the 'beginner' difficulty rating accurate for someone with no DIY experience, and can this project really be done in 3 days?

While classified as beginner, this project involves significant manual labor, especially excavation and moving heavy materials like gravel. The 3-day estimate assumes some DIY familiarity and efficient work; pure beginners might take longer, particularly if dealing with challenging soil or weather conditions. Always prioritize safety and quality over speed to ensure durable results.

The materials list mentions 'Pine Wood'. Should I use untreated pine, and will it last outdoors in contact with the ground?

For outdoor projects like steps that involve ground contact and exposure to elements, it is crucial to use pressure-treated lumber, not untreated pine. Pressure-treated wood is chemically protected against rot, decay, and insect infestation, which will significantly extend the lifespan of your steps. Ensure the lumber is rated for ground contact to prevent premature deterioration.

What's the difference between the listed crushed gravel and decomposed granite, and why do I need both for this project?

Crushed gravel provides the primary structural fill and drainage within the step frames, allowing water to pass through and preventing pooling. Decomposed granite (DG) is a finer material that compacts very well, creating a firm and stable walking surface on top of the gravel. Using both ensures good drainage, structural integrity, and a comfortable, finished step surface.

How do I ensure the timber frames remain stable and don't shift or erode on a sloped terrain over time?

Proper excavation to create level footings for each frame is paramount for stability. The treated tree stakes are critical; drive them deep into the ground on the downhill side of each timber to anchor the frames securely. Additionally, compacting the gravel fill thoroughly within the frames and backfilling the surrounding soil firmly will help prevent movement and erosion.

Transcript
Hide

locally where you live if you have rocks on your property I would suggest that you use some of them to fill a portion of the front of each Bay this will save the amount of gravel that you need to the final step obviously is you're going to fill each of these Bays with gravel and it has to be gravel it can't be sand it can't be dirt because then they'll just become raised beds Full Of Weeds so it has to be gravel also gravel will drain off water from the stair which will lengthen the life of the wood it's best to buy gravel in bulk because it costs a fraction of bagged gravel and you will need a couple 5 gallon buckets for the final phase of the project the exercise phase as I like to call it um and maybe some good music on your headphones the other thing that you need to keep in mind on a big physical project like this is it doesn't need to get done in a day or a week or even a month um I know towards the end of this big project of the 100 step run of steps the last few I don't know this last section I was only filling maybe one or two steps a day so don't don't knock yourself out pace yourself done woohoo how you feel now if the angle ends up being too steep or there are obstacles that you need to avoid well in that instance you're going to need to decrease the angle and create switchbacks which means you're going to be doing a lot of

Auto-generated transcript. May contain errors.