Skip to main content

Continue Building Steps Up the Hillside — Install Support Stakes

Beginner3 mins

Part of project

How to Build Timber and Gravel Steps on a Slope · Step 5 of 8

Helpful?

In this video

Continue the process of assembling frames, leveling, and securing them with rebar stakes, working your way up the hillside. For each step, ensure the new frame is laid flat and flush against the back of the previous step. Pay close attention to levelness to avoid cumulative errors. If necessary, slightly adjust the ground underneath to ensure each frame sits perfectly. Use a string line to maintain a straight path up the hill.

571.0K views8.1K
Mr. Build It

1.0M subscribers

View Channel

FAQs

Is the 'beginner' difficulty rating accurate for someone with no DIY experience, and can this project really be done in 3 days?

While classified as beginner, this project involves significant manual labor, especially excavation and moving heavy materials like gravel. The 3-day estimate assumes some DIY familiarity and efficient work; pure beginners might take longer, particularly if dealing with challenging soil or weather conditions. Always prioritize safety and quality over speed to ensure durable results.

The materials list mentions 'Pine Wood'. Should I use untreated pine, and will it last outdoors in contact with the ground?

For outdoor projects like steps that involve ground contact and exposure to elements, it is crucial to use pressure-treated lumber, not untreated pine. Pressure-treated wood is chemically protected against rot, decay, and insect infestation, which will significantly extend the lifespan of your steps. Ensure the lumber is rated for ground contact to prevent premature deterioration.

What's the difference between the listed crushed gravel and decomposed granite, and why do I need both for this project?

Crushed gravel provides the primary structural fill and drainage within the step frames, allowing water to pass through and preventing pooling. Decomposed granite (DG) is a finer material that compacts very well, creating a firm and stable walking surface on top of the gravel. Using both ensures good drainage, structural integrity, and a comfortable, finished step surface.

How do I ensure the timber frames remain stable and don't shift or erode on a sloped terrain over time?

Proper excavation to create level footings for each frame is paramount for stability. The treated tree stakes are critical; drive them deep into the ground on the downhill side of each timber to anchor the frames securely. Additionally, compacting the gravel fill thoroughly within the frames and backfilling the surrounding soil firmly will help prevent movement and erosion.

Transcript
Hide

My arthritis would kick in. Where the hell did my other steak go? Orcs, it's right here, where I put it. Oh, it's, I promise going forward. It's gonna be a lot easier. That one gave me some trouble because the steak also hit the very bottom landing. That's what's so hard. I gotta catch my breath, man. Don't show people your weakness. This is an easy project, remember? Boom, baby. Here's something you gotta be watching out for as you're going forward. We know that this is all gonna be leveled side to side as we did with the base, but however, there's still plenty of rooms to screw up. When you put your top piece on, make sure that the back end is not to lifted whatsoever whether it's a rock or dirt or anything because it'll jack up and there's no course correcting the further we go. So make sure it's laying nice and flat on the previous piece. And if that's the case on both sides, you should be good to go. But the good thing is with this method, with only making a C, if you do need to move some dirt around, you're not breaking your back, excavating. You just have to carve out this little section in your back in business, baby. Onward and forward. Too short. I should have stayed in school. I'd rather be doing that than this right now. Although these are gonna look sick when they're done. I guarantee it. All right, we've been at this for almost four hours now. We got 10 steps banged out. Very easy, very straightforward, design wise, build wise. Labor intensive for sure. So I'm gonna hammer, throw in a shovel around. Not my ideal Saturday if you ask me. So fellas, if your wife or significant other sent this video to, my bad dude, my bad. Got 13 steps in. I think I need five more. I do. I just think we're almost right here. About 36 inches of height left to cover. And in fact, the way I'm gonna operate it is, run about the three, four to five more steps and then make another landing here. So it's like a bigger pad. So you're not walking on mud or dirt. You're just standing on solid ground. I need a beer and a back massage. See you guys tomorrow.

Auto-generated transcript. May contain errors.