Excavate Terraces — Excavate for Step Frames

Beginner3 mins

Part of project

How to Build Timber and Gravel Steps on a Slope · Step 2 of 8

Helpful?

In this video

Begin the excavation process by digging a series of step-like terraces along the slope. Start from the lowest point of your chosen area and work your way up. Each step should be roughly 5 to 6 inches deep to accommodate the 4x6 lumber. A useful tip is to mark the 5.5-inch depth on your pickaxe handle to maintain consistency as you dig, ensuring even tiers for the subsequent lumber placement.

360.4K views3.9K
Mr. Build It

1.0M subscribers

View Channel

FAQs

Is the 'beginner' difficulty rating accurate for someone with no DIY experience, and can this project really be done in 3 days?

While classified as beginner, this project involves significant manual labor, especially excavation and moving heavy materials like gravel. The 3-day estimate assumes some DIY familiarity and efficient work; pure beginners might take longer, particularly if dealing with challenging soil or weather conditions. Always prioritize safety and quality over speed to ensure durable results.

The materials list mentions 'Pine Wood'. Should I use untreated pine, and will it last outdoors in contact with the ground?

For outdoor projects like steps that involve ground contact and exposure to elements, it is crucial to use pressure-treated lumber, not untreated pine. Pressure-treated wood is chemically protected against rot, decay, and insect infestation, which will significantly extend the lifespan of your steps. Ensure the lumber is rated for ground contact to prevent premature deterioration.

What's the difference between the listed crushed gravel and decomposed granite, and why do I need both for this project?

Crushed gravel provides the primary structural fill and drainage within the step frames, allowing water to pass through and preventing pooling. Decomposed granite (DG) is a finer material that compacts very well, creating a firm and stable walking surface on top of the gravel. Using both ensures good drainage, structural integrity, and a comfortable, finished step surface.

How do I ensure the timber frames remain stable and don't shift or erode on a sloped terrain over time?

Proper excavation to create level footings for each frame is paramount for stability. The treated tree stakes are critical; drive them deep into the ground on the downhill side of each timber to anchor the frames securely. Additionally, compacting the gravel fill thoroughly within the frames and backfilling the surrounding soil firmly will help prevent movement and erosion.

Transcript
Hide

to the project so we begin digging it's pretty simple start on one side and dig like you're making stairs stepping up every five to six Ines next we dig the bottom side which is the easiest because there's less material to remove and then we go on the right side side slope same way as before and finishing it up digging across the top and after youve done your first pass at digging for your 4x6 boards uh we'll set up better boards and then start framing but I just want to walk you through the way I do things and you may do a little different but uh this is how I suggest you start at the lower spots and you make your way up good trick I learned is that you know these boards are 5 and 1 half inch U deep so you kind of measure five and a half inches on your pick and then you start digging uh upward right and as that five and a half inches clears the grab the the the finish grade you kind of know that you need to step up to another level of digging now we're going