Add and Level Sand Bed

Beginner5 mins

Part of project

Concrete Paver Patio · Step 6 of 10

Helpful?

In this video

Next, using a wheelbarrow, distribute approximately 2 tons of sand over the compacted aggregate base. Spread the sand to a uniform thickness of 1 inch. To ensure a perfectly level surface, lay down 1-inch plastic tubes as screed rails. Use a straight wooden board to drag across the tubes, leveling the sand. As you level sections, remove the tubes and fill their impressions with sand, then continue leveling the next section.

Lowe's Home Improvement

1.3M subscribers

View Channel

FAQs

Is a concrete paver patio truly a 'beginner' project, and what specialized tools will I definitely need?

While rated beginner, this project is physically demanding and requires attention to detail. Essential specialized tools include a plate compactor (often rented), a rubber mallet, a level, and possibly a wet saw or paver splitter for precise cuts. Proper tools will significantly improve efficiency and the final result.

What are the most important safety precautions I should take when excavating and laying pavers?

Always wear sturdy work gloves to protect your hands from blisters and rough materials, and use safety glasses and hearing protection when operating power tools like a plate compactor or wet saw. Practice proper lifting techniques to avoid back strain from moving heavy pavers and base materials. Watch out for trip hazards during excavation.

My ground is currently gravel; what's the most common mistake people make with the base preparation that leads to an uneven patio?

The most common mistake is insufficient compaction of the sub-base and gravel layers. Each layer, especially the gravel, must be thoroughly compacted in 2-4 inch lifts, and checked for levelness or consistent slope. Poor compaction will lead to settling, unevenness, and potentially wobbly pavers over time.

The project is estimated at 5 days; how can I realistically plan my time, and what's the biggest variable in cost?

The 5-day estimate assumes full days of work and good weather; factor in material delivery, unexpected delays, and rest breaks. The biggest cost variable will be the pavers themselves (type, size, and quantity), followed by the gravel and sand base materials. Don't forget tool rental costs, which can add up.

Transcript
Hide

pre-ordered 2 tons of quarter minus which is a construction aggregate we needed 2 in of coverage before adding the sand you need to compact the quarter minus as much as possible luckily for us my cousin had a compactor which saved us a lot of time next using close to 2 tons of sand we laid it down 1 in thick a little tip lay down a 1-in plastic tube to help you level out the sand and just move the tubes as you go next you can find 24x 24 papers at Home Depot but you're going to need some muscle because they weigh close to 90 lb as you lay them down on the sand you can use a 2x4