Skip to main content

Excavate the Area

Beginner5 mins

Part of project

Concrete Paver Patio · Step 2 of 10

Helpful?

In this video

Excavate the entire patio area to a depth of 7 inches. This depth accounts for 3.5 inches of drainage gravel, 1 inch of sand, and 2.5 inches for the paver stones. Use a tape measure and a straight board placed across the excavated area to periodically check the depth, especially in the center, ensuring a consistent 7-inch depth throughout.

Lowe's Home Improvement

1.3M subscribers

View Channel

FAQs

Is a concrete paver patio truly a 'beginner' project, and what specialized tools will I definitely need?

While rated beginner, this project is physically demanding and requires attention to detail. Essential specialized tools include a plate compactor (often rented), a rubber mallet, a level, and possibly a wet saw or paver splitter for precise cuts. Proper tools will significantly improve efficiency and the final result.

What are the most important safety precautions I should take when excavating and laying pavers?

Always wear sturdy work gloves to protect your hands from blisters and rough materials, and use safety glasses and hearing protection when operating power tools like a plate compactor or wet saw. Practice proper lifting techniques to avoid back strain from moving heavy pavers and base materials. Watch out for trip hazards during excavation.

My ground is currently gravel; what's the most common mistake people make with the base preparation that leads to an uneven patio?

The most common mistake is insufficient compaction of the sub-base and gravel layers. Each layer, especially the gravel, must be thoroughly compacted in 2-4 inch lifts, and checked for levelness or consistent slope. Poor compaction will lead to settling, unevenness, and potentially wobbly pavers over time.

The project is estimated at 5 days; how can I realistically plan my time, and what's the biggest variable in cost?

The 5-day estimate assumes full days of work and good weather; factor in material delivery, unexpected delays, and rest breaks. The biggest cost variable will be the pavers themselves (type, size, and quantity), followed by the gravel and sand base materials. Don't forget tool rental costs, which can add up.

Transcript
Hide

part of the yard we then move on to the hardest part of the job the digging we have to dig the entire area of the patio some seven inches deep will fill the hole with three and a half inches of drainage gravel one inch of sand and then we'll add the paver stones which are two and a half inches thick right now we're just about six maybe a little over so bad news is we're gonna take another inch and a half off here yeah just about there on I think I can see China now it's easy to measure along the edge and see how deep we are here's a simple way to figure out what the depth is over here in the center tamping that board in would you please we're gonna lay this right across our hole here then we're going to measure from the edge of the board down to the bottom we're getting seven inches right here go check it here that looks good there good okay Tim let's take that away I think we're ready to move on Tim this is

Auto-generated transcript. May contain errors.