Skip to main content

Apply Epoxy Base Coat — Apply the Epoxy Coating

Beginner3 mins

Part of project

Epoxy Floor Coating · Step 6 of 8

Helpful?

In this video

Immediately after mixing, begin applying the epoxy base coat to the floor, as it has a limited pot life. Pour a continuous ribbon of the mixed epoxy directly onto the concrete surface in a manageable section. Using a long-handled roller with a suitable nap (typically 3/8-inch or 1/2-inch shed-resistant roller cover), spread the epoxy evenly across the floor. Work in small sections, maintaining a wet edge to ensure a seamless finish and prevent lap lines. To avoid leaving footprints or disturbing the wet epoxy, wear specialized epoxy spike shoes, which allow you to walk across the freshly applied coating. Ensure full, even coverage over the entire area.

35.3K views2.5K
Mike Day Concrete (Everything About Concrete)

348K subscribers

View Channel

FAQs

Is a 3-day timeframe realistic for a beginner applying epoxy flooring, and what does it entail?

Yes, the 3-day estimate is realistic, but it includes significant drying and curing times, not just active work. Day 1 focuses on meticulous surface preparation (cleaning, repairs, etching), Day 2 on priming (if needed) and applying the epoxy, and Day 3 (and often beyond) is primarily for curing before light use. Rushing any step, especially prep or cure, can compromise the final result and durability.

How critical is surface preparation, and what are the key steps involved before applying epoxy?

Surface preparation is the most critical step for successful epoxy adhesion and longevity. It involves thoroughly cleaning to remove all dirt, oil, and grease using a degreaser. Next, the concrete needs to be etched or ground to create a proper profile for the epoxy to bond to. Finally, any cracks or pits must be repaired with a product like Rust-Oleum Concrete Patch, and the floor must be completely dry before application.

Do I really need specialized tools like a floor grinder, or is chemical etching sufficient for surface prep?

While chemical etching (like with Rust-Oleum Concrete Etch and Cleaner) can be sufficient for some porous or lightly soiled surfaces, a floor grinder (e.g., Tomahawk Power TGDR10) provides a superior profile for epoxy adhesion, especially on very smooth or previously sealed concrete. For optimal, long-lasting results, grinding is often recommended over etching alone. Renting a grinder might be a cost-effective option for better adhesion.

What safety precautions are essential when mixing and applying epoxy floor coatings?

Proper ventilation is crucial due to strong fumes; ensure all doors and windows are open and use fans to circulate air. Wear appropriate personal protective equipment, including chemical-resistant gloves, eye protection (safety glasses or goggles), and a respirator to protect against fumes. Always read and follow the safety guidelines on the product labels for both the epoxy and cleaning chemicals.

Transcript
Hide

project. So, I powerwashed everything and used this degreaser and etcher in one to help prep the concrete to grab the epoxy. Total for this was $56 plus the squeegee. I used a two-part epoxy kit from Benjamin Moore. I needed four kits, so this came to $419. These epoxy shoes are a must. They make it so you can walk on without leaving footprints. I ordered a 40 lb bag of chips on Amazon for $150 and just worked in small sections. And then after it dried, I scraped the top layer and then added

Auto-generated transcript. May contain errors.