Skip to main content

Spread and Roll Out Epoxy — Apply the Epoxy Coating

Beginner3 mins

Part of project

Epoxy Floor Coating · Step 6 of 8

Helpful?

In this video

After cutting in the edges, pour a generous amount of epoxy onto the floor in sections. Using a squeegee with light pressure, spread the epoxy evenly across the floor. The goal is to distribute the epoxy without pushing too hard, which could remove too much material. Immediately follow with a roller on an extension pole to smooth out any lines left by the squeegee and ensure a uniform coating. Work systematically across the floor, squeegeeing in one direction and rolling in the perpendicular direction to achieve the smoothest finish. If you notice any uneven spots, you can roll over them again before the epoxy cures.

10.5K views69
Mike Day Concrete (Everything About Concrete)

348K subscribers

View Channel

FAQs

Is a 3-day timeframe realistic for a beginner applying epoxy flooring, and what does it entail?

Yes, the 3-day estimate is realistic, but it includes significant drying and curing times, not just active work. Day 1 focuses on meticulous surface preparation (cleaning, repairs, etching), Day 2 on priming (if needed) and applying the epoxy, and Day 3 (and often beyond) is primarily for curing before light use. Rushing any step, especially prep or cure, can compromise the final result and durability.

How critical is surface preparation, and what are the key steps involved before applying epoxy?

Surface preparation is the most critical step for successful epoxy adhesion and longevity. It involves thoroughly cleaning to remove all dirt, oil, and grease using a degreaser. Next, the concrete needs to be etched or ground to create a proper profile for the epoxy to bond to. Finally, any cracks or pits must be repaired with a product like Rust-Oleum Concrete Patch, and the floor must be completely dry before application.

Do I really need specialized tools like a floor grinder, or is chemical etching sufficient for surface prep?

While chemical etching (like with Rust-Oleum Concrete Etch and Cleaner) can be sufficient for some porous or lightly soiled surfaces, a floor grinder (e.g., Tomahawk Power TGDR10) provides a superior profile for epoxy adhesion, especially on very smooth or previously sealed concrete. For optimal, long-lasting results, grinding is often recommended over etching alone. Renting a grinder might be a cost-effective option for better adhesion.

What safety precautions are essential when mixing and applying epoxy floor coatings?

Proper ventilation is crucial due to strong fumes; ensure all doors and windows are open and use fans to circulate air. Wear appropriate personal protective equipment, including chemical-resistant gloves, eye protection (safety glasses or goggles), and a respirator to protect against fumes. Always read and follow the safety guidelines on the product labels for both the epoxy and cleaning chemicals.

Transcript
Hide

all right now our material is all mixed we mixed it for three minutes now we're gonna take it and apply it to the floor i got my all squeegee you're gonna take it you're gonna pour a small bead down with close to the wall know that you only have at least a half hour top light which means sitting in this bucket too long could cook off and then the material is no good so you have to have time you got to work with it don't let it sit in the bucket too long you just pour basically the whole bucket down right in which is wearing their cleats so you can purchase these cleats from our company uh i would recommend you uh buying them because trying to go around it squeezing without them is kind of hard so let me show you amy how you can make this a little easier because you're spreading too thick okay so you want to blend it yes you don't want to apply too hard or you take the material off okay so no pressure is added you just kind of lightly move it around correct okay and we're going to take a brush i have one right here in my back pocket awesome and i'm going to start cutting cut it in the walls and the walls all right now we're in the process it's all squeegeed out on the floor now it's all cut in now we're gonna roll this out if you're gonna roll this back and forth we're just gonna smooth the material out once you get it all rolled out you can let it sit for a while if you don't think it's done right you can go back out on it again and you want to squeegee one way and backward the other correct right awesome i can see the difference in me rolling it and then me just squeegeeing it oh yeah there's a big difference so what would happen if you just didn't squeegee and you just rolled uh you're gonna have a bunch of lines through it unless you can put it out real even and then it'll lay out but then you hear you're talking you have to be down around 20 to 30 mils so we're gonna save that for the professionals yes okay

Auto-generated transcript. May contain errors.