Skip to main content

Apply Subsequent Coats and Finish — Step 5: Build Up Durability, Layer by Layer

Beginner4 hours

Part of project

Apply Finish to Stair Treads · Step 5 of 6

Helpful?

In this video

Apply additional coats of polyurethane using the same technique as the first coat: thin, even layers applied with a foam brush, brushing with the wood grain. The presenter suggests looking at the surface from an angle to easily spot any dry spots or areas you might have missed. For this particular project, he applied a total of six coats to achieve a thick, durable finish. Remember to allow each coat to dry for at least two hours, and repeat the light sanding (Step 2) and tack cloth cleaning (Step 3) processes between each subsequent coat to maintain smoothness and ensure optimal adhesion.

23.2K views233
This Old House

2.3M subscribers

View Channel

FAQs

What are the essential tools and materials for applying oil-based polyurethane to oak stair treads?

You'll need an oil-based satin polyurethane, a natural bristle brush or a foam applicator, fine-grit sandpaper (220-grit), tack cloth, mineral spirits for cleanup, and painter's tape to protect adjacent surfaces. Good ventilation and appropriate personal protective equipment like gloves and a respirator are also crucial.

What important safety precautions should I take when applying oil-based polyurethane indoors?

Ensure excellent ventilation by opening windows and using fans to direct fumes outside. Always wear an organic vapor respirator to protect your lungs from harmful fumes. Additionally, wear chemical-resistant gloves to prevent skin contact and dispose of oil-soaked rags properly by soaking in water and sealing in an airtight container to prevent spontaneous combustion.

The project estimates 4 hours; how long does the entire process, including drying and curing, really take for stair treads?

While the active application might take around 4 hours, the total project time is significantly longer due to drying and curing. Each coat of oil-based polyurethane needs 6-8 hours to dry before light sanding and recoating. The final coat requires at least 24-48 hours before light foot traffic and a full 7-10 days to fully cure for maximum durability.

How can I prevent common issues like bubbles, brush marks, or an uneven finish on my stair treads?

To avoid bubbles, apply thin, even coats and avoid overworking the polyurethane with your brush. For brush marks, use a high-quality natural bristle brush and apply in the direction of the wood grain, allowing the polyurethane to self-level. Sand lightly with fine-grit paper between coats to ensure adhesion and a smooth surface, always wiping with a tack cloth before applying the next coat.

Transcript
Hide

And coat number two. Same exact thing. Nice thin even coats. You can kind of look at an angle like this to see if there is a dry spot that you missed because it's kind of hard to tell the more coats you put on. This is looking good. You can do as many coats of poly on this as you want. I ended up doing six coats. I wanted a nice thick finish that'll last a long time and I

Auto-generated transcript. May contain errors.