Inspection, Backfilling, and Grading — Backfilling and Final Grading

Intermediate4 mins

Part of project

Septic System Installation · Step 8 of 9

Helpful?

In this video

After the septic tank and field lines are installed and all connections are made, a state inspector conducts a final inspection to ensure compliance with all health and safety regulations. Once approved, a bulldozer is used to backfill the trenches and cover the septic tank. The disturbed area is then graded to blend with the surrounding landscape, ensuring proper surface drainage away from the house and the septic system components.

589 views26
Essential Craftsman

1.9M subscribers

View Channel

FAQs

Why can't I receive DIY guidance or FAQs for septic system installation?

Septic system installation is classified under the life-safety-defeat risk category. This is due to significant risks including potential trench collapse during excavation, which can cause immediate death or serious injury, and the severe public health and environmental hazards associated with improper waste disposal, such as groundwater contamination. For your safety, public health, and compliance with local regulations, this project requires the expertise and licensure of a qualified professional. Please consult with licensed professionals and local authorities.

Transcript
Hide

pool sh quiet onset we got the state inspector inspection so they just going to take it up get it all get all the fill line covered up and move that big ass dirt pile so there is a crossover which runs keeps it ties every line so there was our stub out they put on a uh sweeping uh te I guess is what it is got it tied into the tank and then put a clean out on it in case we ever have to do anything we can run a uh Roto tool down there a snake in through there clean out the clog and then you can actually dig up the tank if you have an issue as well oh look at that that pile of dirt is gone on everything's about smooth out pretty close man that look better F show now we got to get that pile of mess out of the way well Scotty got all of the uh grade the Dozer work done kind of dressed everything down uh got this pile of crap move so that looks a million times better but uh yeah he did a really good job Tak him two days well day he left about 1:30 2:00 so a day in day in most of the nexts but that's 330 ft of field line th000 gon septic tank and probably 20 to the tank and another 40 so 60 70 ft of 3in drain pipe to get to the field line so he got he got in here got it done and now uh we're ready to hook up we're ready to hook up the toilet son get the plumbing hooked up soon as the cabinets jump in we can start hooking up the sinks and all that good stuff now and uh yeah so we are getting very close here on the melon farm project all right y'all that's it that was our video on uh how how a septic tank gets installed once again I am Keith dkes this was how to install a sepic tank thanks for watching and yes sir you know you know I'm GNA say got it coach

Auto-generated transcript. May contain errors.