Skip to main content

Excavate Trenches and Tank Hole for New System — Excavation

Intermediate4 mins

Part of project

Septic System Installation · Step 4 of 9

Helpful?

In this video

Using the mini-excavator, continue digging a series of trenches from the house towards the new septic tank location, which will be about 50 feet away on the other side of the lawn. Carefully dig the trenches to the required depth and ensure a proper grade using a level stick and measuring tape. The old sprinkler lines encountered during excavation should be removed. During this process, a separate deeper hole is also excavated for the new concrete septic tank.

494.0K views9.3K
Essential Craftsman

1.9M subscribers

View Channel

FAQs

Why can't I receive DIY guidance or FAQs for septic system installation?

Septic system installation is classified under the life-safety-defeat risk category. This is due to significant risks including potential trench collapse during excavation, which can cause immediate death or serious injury, and the severe public health and environmental hazards associated with improper waste disposal, such as groundwater contamination. For your safety, public health, and compliance with local regulations, this project requires the expertise and licensure of a qualified professional. Please consult with licensed professionals and local authorities.

Transcript
Hide

in some cases the new septic tank might go right into the same hole that the old one came out of but that's not what's happening here today this new tank is going to be located about 50 feet away on the other side of the lawn a lot of times this work is done with a backhoe which works really well but these more modern excavators are much more efficient for a job like this the ability for the operator to swivel 360 degrees and move himself with his own tracks in any direction results in a much faster dig the machine is also smaller it has a smaller footprint which reduces the overall impact on the yard when you combine a mini excavator like this for the digging and a skid steer for moving the dirt you've got a very efficient and productive combination and as far as this crew goes you've seen them before on our videos and you ought to know by now how i feel about their work oh the capacity of the new septic tank and therefore the size of the hole that has to be dug is dictated by our local building department they determine the required size by the size of the house and interestingly it's not the square footage of the house it's not even the number of bathrooms in the house they're looking at but it's the number of bedrooms this is how they get an idea of how many people might be living in the house which is really what dictates the capacity of the new system

Auto-generated transcript. May contain errors.