Skip to main content

Install Drip Edge, Ice & Water Barrier, and Underlayment — Install Roofing Felt and Drip Edge

Beginner80 hours

Part of project

Shed Construction · Step 8 of 12

Helpful?

In this video

Install aluminum drip edge around the entire perimeter of the roof, securing it with nails. The drip edge helps direct water away from the fascia and prevents water infiltration. Next, lay down an ice and water barrier (e.g., a synthetic peel-and-stick membrane) along the eaves and in valleys (if applicable). This provides an extra layer of protection against ice dams and water penetration. Finally, cover the remaining areas of the roof deck with synthetic underlayment (e.g., VB Shield), overlapping the ice and water barrier and securing it with plastic cap nails. This underlayment is preferred over traditional felt paper for its durability and water resistance.

118.2K views2.5K
MattBangsWood

487K subscribers

View Channel

FAQs

Is building a DIY shed really a 'beginner' project, and can it truly take 80 hours?

While classified as beginner-friendly, shed construction involves many basic carpentry tasks that require time to learn and execute properly. The 80-hour estimate is realistic for a first-timer, accounting for planning, acquiring materials, and working through each step carefully.

Which specialized tools are most critical for efficient shed construction, especially for framing and roofing?

Pneumatic nailers, such as a coil roofing nailer (like the DEWALT DW46RN) and a siding nailer (like the DEWALT DW66C-1), significantly speed up construction and ensure consistent fastening. Beyond these, a quality level, measuring tape, and chalk line are indispensable for accuracy in every step.

What are the key considerations when choosing and building the shed's foundation?

The foundation is crucial for stability and longevity, preventing moisture damage and shifting. Options include concrete slabs, pier and beam, or gravel bases; choose based on soil type, shed size, and local codes. Ensure it's level and square from the start, as errors here compound throughout the build.

How can I ensure the shed's walls and framing are perfectly square and level?

Consistently use a large framing square and the 3-4-5 triangle method to check for squareness at every framing stage. A long level is essential for plumb walls, and periodically re-check your measurements. This precision prevents problems when installing doors, windows, and roofing.

Transcript
Hide

great choice now you see that white aluminum perimeter that is a drip edge that's going all the way around the perimeter and then we'll move on to the ice and water barrier and the underlayment but I'm going to give you a closer look of some of these components so you know what to expect on your own roof and then a high level overview of just some of the materials that you would expect to have to purchase and use you're going to have drip edge that's

Auto-generated transcript. May contain errors.