Install Drip Edge — Install Roofing Felt and Drip Edge

Beginner80 hours

Part of project

Shed Construction · Step 8 of 12

Helpful?

In this video

Begin by installing the drip edge, starting from the eave on the far side of the roof, and then working towards and up the closer rake. Use tin snips to cut the bottom portion of the drip edge to allow it to 'scissor' over the ridge for a neat finish. Secure the drip edge by shooting nails every 12 to 16 inches. When making corners, fold the drip edge to create a clean, aesthetically pleasing look that also provides continuous support under the shingles. Ensure that the nails never penetrate the front flange of the drip edge; they should only go through the drip edge and into the roof decking.

3.0M views32.0K
MattBangsWood

487K subscribers

View Channel

FAQs

Is building a DIY shed really a 'beginner' project, and can it truly take 80 hours?

While classified as beginner-friendly, shed construction involves many basic carpentry tasks that require time to learn and execute properly. The 80-hour estimate is realistic for a first-timer, accounting for planning, acquiring materials, and working through each step carefully.

Which specialized tools are most critical for efficient shed construction, especially for framing and roofing?

Pneumatic nailers, such as a coil roofing nailer (like the DEWALT DW46RN) and a siding nailer (like the DEWALT DW66C-1), significantly speed up construction and ensure consistent fastening. Beyond these, a quality level, measuring tape, and chalk line are indispensable for accuracy in every step.

What are the key considerations when choosing and building the shed's foundation?

The foundation is crucial for stability and longevity, preventing moisture damage and shifting. Options include concrete slabs, pier and beam, or gravel bases; choose based on soil type, shed size, and local codes. Ensure it's level and square from the start, as errors here compound throughout the build.

How can I ensure the shed's walls and framing are perfectly square and level?

Consistently use a large framing square and the 3-4-5 triangle method to check for squareness at every framing stage. A long level is essential for plumb walls, and periodically re-check your measurements. This precision prevents problems when installing doors, windows, and roofing.

Transcript
Hide

this next part we are going to install the drip edge on the shed we started with the eve on the far side and as you see now we're working kind of on the corner and coming up this far this closer rake it's shot there about every 12 to 16 inches apart here you'll see me cutting the bottom portion of the drip edge to allow the drip edge to scissor over the ridge drip edge is installed before felt this is to mitigate water getting behind the drip edge on drip edge the nails should never penetrate the front flange in other words they should not be seen from the ground nails should all penetrate the drip edge and shoot into the decking of the roof in other words on the back of the drip edge you'll see here we're going to make the corner of the drip edge we've seen drip edge installed on corners many different ways some ways look like serious crap in other ways look good this is the way that we've found looks the best overall and allows for support under the shingles

Auto-generated transcript. May contain errors.