Skip to main content

Seal Stained Treads — Finish New Treads

Beginner3 mins

Part of project

Stair Treads · Step 6 of 6

Helpful?

In this video

After the stain has completely dried, apply four coats of a clear sealant, such as Varathane NanoDefence Premium Clear Floor Finish (Satin), to protect the treads. Apply thin, even coats, allowing each coat to dry for the recommended time (2 hours for re-coat) before applying the next. This step will protect the stained wood from wear and tear.

55.8K views421
This Old House

2.3M subscribers

View Channel

FAQs

What essential tools will I need to successfully install new stair treads?

You'll primarily need a tape measure, a stair tread gauge or T-bevel for accurate angles, a miter saw or circular saw for precise cuts, construction adhesive, and a brad nailer or screws with a drill for secure fastening. Don't forget safety glasses and hearing protection.

What are the critical safety precautions to take when working on a stair tread project?

Ensure the existing stair structure is stable before starting. Work on one or two steps at a time to maintain safe access. Always use appropriate personal protective equipment like safety glasses and ear protection, and keep your work area clear to prevent trips and falls.

As a beginner, how difficult is this project, and what should I expect for time and cost?

This project is manageable for a beginner but requires patience and precision, especially with measurements and cuts. Expect it to take around 3 days, as listed, allowing for drying times. Costs will vary significantly based on material choice, from a few hundred dollars for laminate to over a thousand for solid hardwood.

What common mistakes should I watch out for when installing new stair treads?

Common mistakes include inaccurate measurements leading to gaps, insufficient adhesive or fasteners causing squeaks, and not properly preparing the sub-tread. Always dry-fit each tread before final installation, use plenty of construction adhesive, and ensure a clean, level surface underneath.

Transcript
Hide

didn't do things in the intended order that we originally planned no project plan survives engagement print and we decided that we were going to stain steps before we painted the risers right there we finished the staining on the steps and we've also finished the bear thing

Auto-generated transcript. May contain errors.