Skip to main content
Oak Valley DesignsOak Valley Designs
BrowseMy Projects
Log inSign up
Oak Valley Designs
Project video

Step 3 · Inspect Your Foundation: Checking the Substrate

Look closely at each existing tread. Check for any signs of rot, significant cracks, or warping. A soft or damaged tread must be repaired or replaced for safety and peace of mind. You can fill small cracks with wood filler or epoxy. Make sure every tread is level; if not, you can use shims to raise low spots or sand down high spots. A solid, level foundation is non-negotiable for a safe staircase.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Inspect Your Foundation: Checking the Substrate

Look closely at each existing tread. Check for any signs of rot, significant cracks, or warping. A soft or damaged tread must be repaired or replaced for safety and peace of mind. You can fill small cracks with wood filler or epoxy. Make sure every tread is level; if not, you can use shims to raise low spots or sand down high spots. A solid, level foundation is non-negotiable for a safe staircase.

← Project

Solid Wood Stair Tread Replacement

Step 3 of 8·9 hr left

Clear the Way: Removing Old Carpet and Padding
60 minutes
Prep for Perfection: Removing Adhesives & Fasteners
45 minutes
3
Inspect Your Foundation: Checking the Substrate
60 minutes
4
Measure Twice, Cut Once: Sizing Your New Treads
90 minutes
5
Bringing it Together: Installing the New Treads
120 minutes
6
The Finishing Touch: Sanding and Sealing Your Treads
180 minutes
7
Creating a Safe Edge: Installing Stair Nosing
60 minutes
8
Achieving a Flawless Look: Filling Screw Holes
30 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.