Skip to main content

Install the Flush Stairnosing — Prepare Stair Nosing Surface

Beginner8 hours

Part of project

How to Install Aluminum-Channel LED Lighting on Stair Nosings · Step 2 of 7

Helpful?

In this video

With the flooring and riser materials firmly in place, you are ready to install the flush stairnosing. First, scuff or abrade the underside (non-printed side) of the stairnosing with coarse sandpaper to create a better bonding surface for the adhesive. Then, clean the scuffed surface with denatured alcohol applied to a clean rag and allow it to dry completely. Once dry, apply a liberal, uniform bead of a premium construction adhesive, such as Loctite PL Premium, in an S-pattern along the full length of the stairnosing. Position the nosing close to the edge of the installed flooring and rotate it into place. Apply firm pressure to ensure a flush fit to the stair edge and a level, flush fit against the installed flooring. Use painter's tape to hold the stairnosing securely in place while the adhesive cures. Optionally, you can use finishing nails for added security, but remember to pre-drill the nail holes, countersink the nails, and fill all nail holes with a coordinating colored caulk.

151.7K views540
This Old House

2.3M subscribers

View Channel

FAQs

What kind of power supply do I need for these LED strips, and what are the main electrical safety considerations?

You'll need a low-voltage DC power supply (transformer) that matches the voltage requirements of your LED strips, typically 12V or 24V DC. Always ensure the power supply wattage exceeds the total wattage of your LED strips by at least 20%. Before starting any wiring, always disconnect power at the circuit breaker to prevent electrical shock.

Is cutting the aluminum channels difficult, and how do I get clean, accurate cuts for my stair nosings?

Cutting aluminum channels isn't difficult but requires precision. Use a fine-tooth hacksaw, like the Milwaukee High-Tension Hack Saw listed, and mark your cuts clearly with a marking pencil. For the cleanest cuts, use a miter box to guide your saw, then file down any rough edges to prevent snags and ensure a smooth finish.

What's a common mistake during channel installation, and how can I ensure the channels stay securely attached and straight?

A common mistake is inadequate surface preparation, leading to poor adhesion. Before applying adhesive, thoroughly clean and degrease the stair nosing surface. Use a level to ensure channels are perfectly straight, and apply even pressure while the construction adhesive sets, potentially using temporary clamps or Painter's tape to hold them in place.

I'm new to wiring; how do I make reliable connections between the LED strips, especially around corners?

For reliable connections, especially around corners, use specialized LED strip connectors like the Armacost Lighting SureLock Connector Assortment Pack. For permanent installations, soldering connections and then protecting them with heat-shrink tubing (Eclipse Tools Heat Shrink Tubing) provides the most durable and secure bond. Always double-check polarity (+ to + and - to -).

Transcript
Hide

install the flush stair nosing start by scuffing or braiding the underside of the nosing with coarse sandpaper using sandpaper abrade the non-printed side of the nosing and remove any dust with denatured alcohol applied to a clean cloth and allow to dry apply a liberal uniform bead of a premium construction adhesive such as loctite pl premium in an s pattern the full length of the nosing position the nosing close to the edge of the installed flooring and rotate into place applying firm pressure ensuring a flush fit to the stair edge as well as a level and flush fit against the flooring painters tape can be used to hold the stair nose in place until the adhesive has a chance to fully cure although not required the stair nosing can be installed with finishing nails as well to hold the nosy in place until the adhesive has had a chance to fully cure if you choose this option make sure to pre-drill the nail holes countersink the nails and fill all nail holes with a coordinating colored cog allow 24 hours for cure time prior to foot traffic

Auto-generated transcript. May contain errors.