Apply Adhesive and Install Risers/Treads — Install Risers (if applicable) and Finishing Touches

Intermediate3 mins

Part of project

How to Install Treads and a Landing Pad on L-Shaped Stairs · Step 5 of 5

Helpful?

In this video

Before applying adhesive, ensure all risers and treads are dry-fitted and numbered to match their specific stair step. Apply construction adhesive, such as Bostik's BEST or a general construction adhesive, to the surface of the riser and the tread below using a 1/4 inch V-notch trowel. Spread the adhesive evenly, creating consistent ridges. First, install the riser by pushing it firmly against the existing riser structure. Then, install the tread, ensuring its nosing is flush with the top of the installed riser. Use a rubber mallet to gently tap the tread into its final position, ensuring a tight fit. Once the riser and tread are properly seated, use a pin nailer (e.g., Milwaukee M12 FUEL 23GA Pin Nailer) to fasten them. Apply nails across the perimeter of the riser and tread to secure them while the adhesive cures. The 23-gauge headless pins are virtually invisible. Continue this process for all stair steps.

198.4K views1.5K
Refresh Home Improvements

214K subscribers

View Channel

FAQs

What tools are essential for getting precise cuts on L-shaped treads and the landing pad?

Accurate measurements are key. A good quality measuring tape, a combination square, and a reliable miter saw or circular saw with a straight edge guide are crucial for precise cuts, especially for the angles of the L-shaped landing and any mitered tread returns. Always dry-fit your cuts before applying adhesive to ensure a perfect fit.

What are the most important safety precautions to take when working on stairs?

Safety is paramount when working on stairs. Always wear appropriate personal protective equipment like safety glasses, gloves, and hearing protection. Ensure the work area is well-lit, free of debris, and secure any unstable steps before starting. Be mindful of tripping hazards from removed materials and tools.

The project is listed as 'intermediate' and '3 days'. What makes it challenging, and can it be done faster?

The 'intermediate' difficulty comes from the need for precise measurements, especially around the L-shaped landing, potential subfloor repairs, and ensuring consistent rise/run. The 3-day estimate often accounts for adhesive curing times and the careful pacing needed for detailed work. While experienced DIYers might finish faster, rushing can lead to mistakes and an imperfect finish.

What are common mistakes people make when installing new treads and a landing pad, and how can I avoid them?

Common mistakes include inaccurate measurements leading to gaps, failing to properly prepare the subfloor causing squeaks, and inadequate adhesive application resulting in loose treads. To avoid these, measure multiple times, address all subfloor imperfections, and apply construction adhesive generously in a serpentine pattern, supplemented with fasteners as recommended.

Transcript
Hide

adhesive the adhesive we'll be using for this project is bostick's best adhesive and this is the same adhesive that we used for the flooring now we're using this adhesive because it's expensive and we have a little bit left over from our flooring but you can certainly use a general construction adhesive if you don't have one of these just lying around the application process is very similar to our wood flooring process because all i'm doing is using a quarter inch v-notch trowel to go over the entire surface and then installing our flooring or in this case our stair riser in order for us to guarantee that these stair treads and risers don't move on us while we're working our way up i actually picked up this slick looking milwaukee pin nailer that is battery operated which makes it extremely easy to install nails across the perimeter of these boards to guarantee that these boards don't move on us while it's in the curing process the best thing about these nails is that they're 23 gauge headless nails which basically means you barely even see the hole where the nail penetration occurred after the first riser taken care of i then proceed to applying our adhesive to the first tread as well as the second riser that way i'm able to kill two birds with one stone and the application of the glue is actually a little less messy if i'm applying to both surfaces at the same time i install the riser first and then the tread but i don't actually nail the riser before i install the tread i actually am just trying to make sure that everything is fitting snugly and nicely and you might need to grab a rubber mallet and just give a few love taps to make sure everything fits tight and then nail it in place that way you know all the seams are at the appropriate locations as well as the fact that the seam between the stair tread and the riser should be as seamless as possible as you're making your way up again same exact process apply the glue to the stair tread as well as the riser above it install the riser then install the tread push it into place give it a few love taps nail it in place and move on to the next one as a general side note i do apply a few extra fasteners to the very top row on the riser because you're never going to see it once the stair tread above it is positioned properly once installed and nailed down i remove my blue painters tape and move my way up the stairwell this is actually extremely quickly as far as the installation process goes because…

Auto-generated transcript. May contain errors.