Skip to main content

Apply Primer Coat — Prime the Paneling

Beginner3 mins

Part of project

How to Install Board and Batten Up a Staircase Wall · Step 7 of 8

Helpful?

In this video

Once the caulking and wood filler are dry and sanded, it's time to prime the wall. Apply an even coat of primer to the entire board and batten surface, including the MDF and the exposed wall sections. A paint sprayer can provide a very smooth finish, but a roller and brush can also be used. Allow the primer to dry completely. The video indicates this step was done on a separate day from the painting.

743 views39
Cozy DIY Home

852K subscribers

View Channel

FAQs

What type of wood is recommended for board and batten, and can I use alternatives?

For this project, 5/16 in. x 1-1/2 in. wood lath is specified for battens and 1 in. x 6 in. whitewood boards for the panels. You can also use MDF (medium-density fiberboard) for both, which is often more cost-effective, readily available, and provides a smoother finish for painting, though it's less durable against dings than solid wood.

Is installing board and batten on a staircase wall much harder than a flat wall?

It's slightly more challenging due to the angles and varying heights along the staircase. You'll need to be precise with your measurements and cuts for the horizontal boards to follow the rake of the stairs, and ensure your vertical battens remain plumb. A good level and miter saw are crucial for accuracy.

What are the most important safety precautions to take when working on stairs?

Always use a stable ladder or scaffolding system designed for stairs to ensure safe footing at all heights. Wear appropriate personal protective equipment, such as safety glasses when cutting wood, and ensure good ventilation when priming and painting. Keep your work area clear of trip hazards.

How do I ensure even spacing and plumb vertical battens on a sloped staircase wall?

Careful layout is key. Use a measuring tape and pencil to mark the desired spacing from the bottom up, ensuring each mark is equidistant. Use a long level to verify that each vertical batten is perfectly plumb before nailing it, adjusting as needed. Double-check your measurements for each batten, as the wall may not be perfectly uniform.

Transcript
Hide

you guys for watching the channel. And here we are putting the first coat of primer and we did this on separate days because we weren't painting that same day. And this is our first coat of paint right here, again another day. We had to let the primer dry in between.

Auto-generated transcript. May contain errors.