Install Structural Support Blocks and Stringer Reinforcement — Reinforce Stair Structure (If Necessary)

Beginner3 mins

Part of project

How to Make Steep Basement Stairs Safer · Step 5 of 5

Helpful?

In this video

After gaining access, remove any existing wedges that are no longer providing sufficient support. Cut and install new support blocks made from sturdy lumber (e.g., 2x4, 2x6, 2x8, or 2x12) under the treads. It's recommended to use pressure-treated lumber if there's any risk of moisture. These blocks should be cut level, not at the same slope as the dadoed stringer. Ensure the top surface of each new block aligns perfectly with the top line of the dado slot in the stringer. You can also use wider lumber or stack multiple pieces of narrower lumber (e.g., two 1x4s instead of one 1x8) to achieve the desired support and fit.

37.0K views415
stairbuilding

75K subscribers

View Channel

FAQs

What are the essential tools and materials I'll need to start making my steep basement stairs safer?

For electrical improvements, a voltage tester, wire, and suitable light fixtures like the Armacost LED puck lights are crucial. For handrail installation, have a drill, stud finder, measuring tape, the Woodgrain Millwork handrail, and Everbilt brackets ready. Don't forget basic safety gear and a powerful flashlight like the Defiant 2000 Lumens LED for inspecting dark areas.

What are the most important safety precautions to take when working on steep basement stairs?

Always ensure adequate lighting in your work area to prevent missteps; use your flashlight to identify tripping hazards. Before touching any wiring for new lights, always use a voltage tester to confirm power is off at the circuit breaker. When applying non-slip treads, ensure the stairs are clear and dry, and consider working during daylight hours to maximize visibility.

Is this project suitable for a beginner, and can it realistically be completed in 3 days?

Yes, many aspects like installing lights and handrails are beginner-friendly with careful planning and execution. The 3-day estimate is achievable for most DIYers, allowing time for assessment, material acquisition, and installation across multiple steps. The most challenging part might be ensuring handrails are securely mounted into studs or assessing structural needs.

What common mistakes should I avoid when installing new handrails or non-slip treads?

For handrails, a frequent mistake is not securing them directly into wall studs or proper blocking, which can lead to a wobbly and unsafe rail; always use a stud finder like the DEWALT DW0150. When applying non-slip treads or tape, ensure the stair surface is meticulously clean, dry, and free of debris for optimal adhesion and longevity.

Transcript
Hide

and the next step would be to remove any of the wedges so that you could install some type of a block and i'll leave it up to you if the block needs to sit on top of a pressure treated board and don't forget that these blocks can be wider also you could use a by six to a two by twelve two by eight maybe even some two by fours to make these structural supports work now what we're looking at here is a board that is going to be level and not matching the slope of the dadoed stringer so make sure that these are level and lining up with the top line here or should i say lining the top of this block up with the top of the slot notched into the stringer and another thing i should point out is that you could always use wider lumber for example if i wanted to use a 2 by 12 i would just make this board a little smaller so that the top of the 2 by 12 lines up with the top of this line here so again we're not going to line the top of it up with the bottom we're going to make sure it's parallel to the line on the top and like i said you can use thicker pieces of lumber or even other types of lumber whatever you think is going to work including using a notched stringer something like this and i understand that this might be a little more difficult for do-it-yourselfers however it is another option and of course we can see where the top of this line is lining up parallel with the line in the stringer and the same with our risers and we can structurally attach the stringer to the wall framing studs with some nails or screws and you can always add some type of post or support studs underneath here to make it a little stronger let's go ahead and take a look at the other side and here we've changed the direction of the support boards and in this case we're using some 1 by 10 however if all you had was 1 by 4 then you could put a 1 by 4 here and then one next to it and then another one next to it and that's kind of what i meant by using one by four or two by fours and of course you do not need to be obsessed with doing everything the way that i have laid it out here and can get as creative as you want to to create your own structural support framing system and after you have created the supports and you're happy with them you can feel free to install the risers and the treads and you can start from the bottom or the top whatever you think is going to work best for you