Skip to main content

Measure and Cut Carpet — Measure and Cut Carpet Treads

Beginner4 hours

Part of project

How to Install Outdoor Carpet Stair Treads on Concrete Steps · Step 2 of 6

Helpful?

In this video

A large piece of carpet is rolled out on the floor. The width of each stair step is carefully measured using a tape measure. A straight edge is then aligned with the measurement, and a utility knife is used to precisely cut the carpet to the required size for each step. This ensures that each carpet piece fits snugly across the width of its respective stair.

48.7K views115
Direct Carpet

8K subscribers

View Channel

FAQs

Why is thorough cleaning of the concrete steps so important before installing carpet treads?

Proper cleaning ensures the adhesive bonds securely to the concrete, preventing the treads from lifting prematurely. Any dirt, debris, or loose paint can compromise the adhesive's effectiveness. Use a scrub brush and pressure washer for the best results, letting the steps dry completely before proceeding.

What's the difference between using a full roll of outdoor carpet versus pre-cut stair treads for this project?

A full roll, like TrafficMaster Dayside Ebony, offers more customization for odd-sized steps but requires precise measuring and cutting with a carpet knife. Pre-cut treads, such as Nance Peel and Stick options, save time on cutting and often come with pre-applied adhesive, making installation quicker for standard step sizes.

How do I ensure the adhesive is applied correctly for a strong bond, and what tools should I use?

Use a notched trowel, like those in the MARSHALLTOWN Tile Kit, to spread the Henry 663 or ROBERTS 6700 adhesive evenly over the concrete surface, creating ridges that help with adhesion. After placing the tread, use a heavy roller, such as the ROBERTS 35 lb. segmented roller, to ensure full contact and press out any air bubbles for a strong, lasting bond.

What are common mistakes to avoid, and how do I troubleshoot if my carpet treads start lifting at the edges?

Common mistakes include insufficient surface preparation, not enough adhesive, or not properly rolling the treads. If edges lift, re-apply adhesive to the problematic areas, ensuring full coverage to the edge of the tread. Press firmly and use the roller again to ensure maximum contact, then allow ample curing time.