Skip to main content

Sand the Repaired Area — Sand Patched Areas Smooth

Beginner4 hours

Part of project

How to Fill Nail and Staple Holes in Stairs After Carpet Removal · Step 4 of 5

Helpful?

In this video

Once the wood filler is completely dry and hard, use a sanding sponge or sandpaper to smooth the repaired area. Start with a medium-grit sandpaper (e.g., 120-180 grit) to quickly shape and level the filler, then progress to a finer grit (e.g., 220-320 grit) for a super smooth finish that blends seamlessly with the surrounding wood. Ensure the surface is perfectly smooth to the touch, as any imperfections will be visible once painted.

27.1K views342
This Old House

2.3M subscribers

View Channel

FAQs

Do I need an orbital sander, or is a hand sanding block enough for this project?

An orbital sander can significantly speed up sanding larger areas on stair treads. However, a hand sanding block with a fine-grit sanding sponge (e.g., Gator Super Sponge 320-Grit) is often sufficient and more precise for small patched spots and intricate stair contours. For best results, use both: orbital for general smoothing and hand sanding for detailed work.

What are the most important safety precautions when sanding and cleaning old stairs?

Always wear a dust mask or respirator to protect your lungs from fine wood dust and potential lead paint from older stairs. Ensure good ventilation by opening windows or using a fan like the FANFAIR high-performance floor fan. Keep the stairs clear of tools and debris to prevent tripping hazards during the process.

My wood filler isn't drying evenly or is shrinking too much. What went wrong?

Uneven drying or excessive shrinkage usually happens if the filler is applied too thickly at once or if the hole wasn't clean. For best results with DAP Plastic Wood-X, apply in thin layers, pressing firmly into the hole, and allow each layer to dry completely. Slightly overfill the hole to account for minor shrinkage, then sand flush.

Is 4 hours a realistic time estimate, or should I prepare for a longer project?

The 4-hour estimate covers active work like cleaning, applying filler, and sanding. However, it does not typically include the drying time required for the wood filler, which can take several hours depending on the depth of the holes and humidity. Plan for the project to potentially span two sessions to allow for proper drying.