Skip to main content

Lay First Row with Spacers — Install First Row of Planks

Beginner5 mins

Part of project

Hardwood Flooring Installation · Step 4 of 9

Helpful?

In this video

Place 1/2-inch spacers along the wall where you begin your first row of flooring. These spacers ensure an adequate expansion gap between the flooring and the wall, which is necessary for the planks to expand and contract with changes in humidity without buckling. Begin laying the first row of planks, making sure to cut the initial planks to the predetermined starting width if necessary (as per planning in Step 4). This specific flooring uses 4-inch and 6-inch wide random-width pieces, with a focus on laying full 4-inch pieces to start the row to simplify future cuts.

60.7K views1.6K
Cali Floors

6K subscribers

View Channel

FAQs

What are the most critical steps for a beginner to get right during hardwood floor installation?

Subfloor preparation and plank acclimation are paramount for a successful hardwood floor. Ensure the subfloor is meticulously clean, level, and dry to prevent future issues. Acclimating the wood planks in the installation area for several days allows them to adjust to your home's specific humidity, which is essential for preventing warping, gapping, or buckling after installation.

What specialized tools are essential for hardwood flooring installation that I might not already own?

For a nail-down installation, a flooring nailer/stapler (like the Freeman PFL618C) is indispensable. You'll also need a chop saw or miter saw for precise cuts and potentially a jamb saw for undercutting door casings. A quality shop vacuum and industrial floor scraper are crucial for proper subfloor preparation, and a chalk line will help keep your rows straight.

How long should I expect the entire hardwood flooring project to take, especially for a beginner?

While the installation itself might be estimated at 5 days, the total project time for a beginner can be longer. Crucially, hardwood planks require 3-5 days (or as per manufacturer instructions) for acclimation before installation even begins. Extensive subfloor preparation, such as applying self-leveling underlayment, can also add significant time, potentially extending the project to over a week.

What are the main safety precautions to take when installing hardwood flooring?

Always wear appropriate personal protective equipment (PPE), including eye protection, hearing protection when using power tools or the flooring nailer, and work gloves. Ensure good ventilation, especially when working with adhesives like Henry 1171, and follow all product-specific safety guidelines. Keep your work area tidy to avoid tripping hazards from tools and materials.

Transcript
Hide

Perfect clean line. So, we're going to make our first cuts here against the wall under the window. Work our way out. Give ourselves a full piece coming off the front of the fireplace. And to do so, I need a table saw. So, that's what you're going to want to do next is make your cuts after you measure the width of your room and then get started. 1/2 in spacers against the wall here. That way the floor has plenty of room for expansion and come traction. And make sure we're doing the same thing over here against the fireplace. We're going to be using a quarter round which will cover that gap there. So here we're coming off with a 6-in piece. And this is just my floor specifically. Your flooring, if it's not random width, will be a little bit different. We did the math and did the pattern this way so that I don't have to cut and notch a piece here. here and I can run a full 4 in board the whole way across. So that's pretty stable. That's where that's going to be. Now let's mark out our spots. All right. So we're cutting this to length. I got the spacer against the wall. I'm just going to make a tick mark on the opposite side. I've got the board flipped over so that way when I cut here, it'll fit perfectly onto this part.

Auto-generated transcript. May contain errors.