Skip to main content

Staircase Layout and Landing Installation — Install Your Landing Piece First

Beginner

Part of project

I want to replace the carpet of 15 stair steps with a landing and turn at step 13. Steps are 35 1/4" wide. · Step 4 of 5

Helpful?

In this video

After preparing all the timber, allow it to rest for two days. This resting period helps the wood stabilize before permanent installation. Then, install the top landing. Begin by marking the position of the staircase at the installation site using a laser level and measuring tape for accuracy. Ensure the exposed sill, called 'kamachi', which was previously installed with the second floor, is properly aligned. Add an additional kamachi made from pine, matching the step size, to the front of the landing. The landing floor will use the same flooring as the second floor. Secure all components using screws and a drill.

1.1M views23.2K
The Home Depot

659K subscribers

View Channel

FAQs

What essential tools will I need for this stair tread replacement project?

You'll need a utility knife, pry bar, and hammer for old carpet removal. For new tread installation, gather a tape measure, miter saw or jigsaw for precise cuts, construction adhesive, and a nail gun or drill. Don't forget safety glasses and gloves for protection.

What safety precautions are crucial when working on stair projects like this?

Always ensure good lighting and clear your workspace of debris to prevent falls. Wear appropriate safety gear like gloves and eye protection when using tools. Work cautiously, especially when carrying materials, and avoid using the stairs until the installation is fully cured and secure.

How do I accurately measure the complex landing and the angled steps around the turn?

For the landing and any unusually shaped steps, create precise templates using cardboard or thick paper. Trace the exact shape, including any angles or curves, then transfer these to your measurement sheet. Measure each individual step width and depth, as they can vary slightly, and double-check all dimensions.

Why is it recommended to install the custom landing piece first in this project?

Installing the landing first provides a critical and stable starting point, allowing for a perfectly level and secure foundation. This ensures that when you install the individual stair treads, they will butt up cleanly and seamlessly against the finished landing piece. Trying to fit a large custom landing after treads are in place can lead to difficult cuts and unsightly gaps.

Transcript
Hide

screws now the timber gets a coin na for 2 days this is a straightforward straight staircase but it doesn't reach the second floor instead it has a land one step below the second floor level I think it'd be fine to take it all the way to the top on the right side of the landing is a second floor hallway while to the left is the entrance to a closet this layout allows access to the second floor from both Sid of the landing a design I haven't tried before it's a bit unusual but not bad it's a common straight staircase but with fewer steps when building staircases with Landings or winders I always finish the landing or Winder First this helps to determine the accurate length for the straight stairs here I start by completing the top blending after that I Mark the position of the staircase at the installation side I installed an exposed seill called kamachi along the edge when building the second floor I will also add a kamachi made from Pine and matching the step size on the front of the land The Landing floor uses the same flooring as the second

Auto-generated transcript. May contain errors.