How to Install an Alternating Tread Stair Kit

How to Install an Alternating Tread Stair Kit

Advanced
8 hours
7 Steps
21 Items

About This Project

This project involves installing a pre-fabricated alternating tread stair kit to access a loft, attic, or other elevated space. The process includes preparing the opening, assembling the stair kit according to manufacturer instructions, and securing it to the existing structure.

R

Based on content from

RR Buildings
1.9M subscribers· +9 others
View Channel

Tools & Materials

Measuring Tape

Measuring Tape

Pencil

Pencil

Makita 15 Amp Reciprocating Saw JR3070CTZ

Makita 15 Amp Reciprocating Saw JR3070CTZ

MGP 24 in. H Teak Wood Extendable Circular fence Trellis TCF-36

MGP 24 in. H Teak Wood Extendable Circular fence Trellis TCF-36

Jig Saw

Jig Saw

Safety Glasses

Safety Glasses

Steps

Frequently Asked Questions

What specialized tools are essential for accurately cutting the floor opening and assembling the stair kit?

You will need a reciprocating saw or circular saw for precisely cutting the floor opening, and a jigsaw for any detailed cuts or adjustments. An impact drill/driver is crucial for efficiently securing the kit's components and attaching it to your structure. Don't forget a reliable measuring tape, a level, and a stud finder to ensure accurate placement and a plumb installation.

While the assembly of the pre-fabricated kit is generally straightforward for beginners, accurately cutting and framing a floor opening requires careful measurement and basic carpentry skills. The 8-hour estimate is achievable if the opening is simple and you have all tools and materials readily available, but unforeseen structural challenges or complex framing can significantly extend the project time.

A common mistake is inaccurate measurement for the rough opening, leading to fit issues; always double-check the manufacturer's specifications. Another error is insufficient anchoring; ensure you are securing the top and bottom of the stairs to solid structural framing using appropriate lag screws and brackets, not just subfloor or drywall. Not checking local building codes for stair angle, tread dimensions, and handrail requirements is also a frequent oversight.

Alternating tread stairs are often permitted in specific situations (like access to lofts or attics) where conventional stairs would be too steep or long, but they are typically not allowed for primary egress. Always verify with your local building department about their acceptance and specific requirements for your intended use case. You should hire a professional if you are uncomfortable with structural modifications, don't have the necessary tools, or if local codes require professional installation or inspection.

After the initial installation, periodically check all fasteners (screws, lag bolts) at the top and bottom connections, as well as those securing handrails and guardrails, to ensure they remain tight. Inspect the treads and risers for any signs of loosening, wear, or damage. Ensure handrails are always secure and stable, as they are critical for safe ascent and descent.